I have been asked to put a picture up every day showing the progress of the shop that is being built.
Yesterday was day number one.
The footings were put in. Can't really see the size but it will be 50 x 100.
Don't you like how much can be seen from the house? Unfortunately that will not last.
Day two had the two drains put in and sand being put down. The blue thing in the middle is our water collector. A sump and hose will be used to remove the water when the barrel is full.
1 comment:
awesome guys! Your view of that Alberta sky is even bigger without the trees/old shop. I guess in about a week that part of your sky will be gone again:)
Post a Comment